India is a top-5 solar panel producer and a growing wind turbine component manufacturer. EU's accelerated renewable energy targets (REPowerEU) create strong demand for Indian solar modules, mounting structures, and wind components.
+35% CAGR for Indian solar equipment exports — driven by EU REPowerEU programme
FTA duty impact
EU MFN: 0% on solar cells and modules (temporary). Anti-dumping measures on Chinese modules create opportunity for Indian producers. FTA: mutual recognition of renewable energy standards.
Bilateral trade flow
India ↔ EU · the directions.
India to EU (Exports)
Solar PV modules and cells, aluminium mounting structures, solar inverters (string, central), wind turbine castings and forgings, tower flanges, battery storage components, EV charging equipment
EU to India (Imports)
EU wind turbine complete systems (offshore and onshore), EU battery energy storage, EU solar inverters, EU smart grid technology
Sector risk framework
Risks · assessment · mitigation.
Risk
Assessment
Mitigation
Market access and regulatory compliance
Medium / Medium
Engage EU-qualified compliance advisors and ensure all documentation meets destination market requirements.
Every Direction. Every Configuration. Commission-Only.
Not just bilateral India↔EU. AJG brokers all directions — Unilateral, Bilateral, Trilateral, Multilateral.
Each route below is an active mandate configuration we work across both principals.
TRILATERAL
India → UAE → EU
Via: Dubai JAFZA
UAE CEPA gives 0% duty for Indian goods into UAE. UAE-EU trade then routes finished goods to Europe. Significant duty + logistics advantage.
💡 8–15% duty saving on select HS codes vs direct India→EU
Renewables Equipment Export — India to EU · 6 steps
Beyond solar panels (covered in Green Energy SOP), India manufactures hydropower turbines, biomass boilers, biogas equipment, fuel cells, and energy storage systems. IEC standards, CE marking, and EU product safety regulations apply. EU Green Deal creates structural demand for all forms of renewable energy equipment. This SOP covers renewables equi…
Market and Regulatory Assessment— 4-8 weeks
EU Compliance and Certification Programme— 3-12 months depending on sector
EU Buyer Identification and Qualification— 3-6 months
Commercial Negotiation and Contract— 4-8 weeks
Order Execution, Quality Control, and Pre-Shipment— Throughout production cycle
Shipment, Documentation, FTA Optimisation, and Post-Export Incentives— 2-4 days per shipment